Product Manager/Project Manager/Manager/Supervisor/Team Leader
at
PIC
, Kuwait
August 2008 – Currently Working
Industry: Oil and Gas/Power/Infrastructure/Energy
Functional area: Engineering Design / R&D
PLANNING, Testing &INSTALLATION OF 73 NOS OF 6.6KVVACUUM CIRCUIT
BREAKER/SF6 Breaker.
REPLACEMENT AND INSTALLATION OF 2 NOS OF
MCC
PLANNING FOR REPLACEMENT OF 50 NOS OF SIEMENS MCC.
Verification and approval Siemens Switch board and MCC drawing,
network analysis
ESTIMATE FOR OVERHEAD CRANE Estimation.
Material Inspection
Design, procurement and installation of
132/6.6KV Transformer
Installation of SCREW COMPRESSOR & AIR
DRYER
Product Manager/Project Manager/Manager/Supervisor/Team Leader at CCC , Saudi Arabia
December 2006 – November 2007
Inspection of Elect Equipment, Testing of Cable, Motor Control
Centre, SWITCH GEAR, CONTROL GEAR, INSPECTION OF DUCT BANK, CABLE
TRAY, GENERATOR SYARTING UNIT, LIGHTING PANEL, BATTERY, BATTERY
CHARGER, CT, PT, LA.
Preparation of quality control procedure
and inspection test plan of electrical equipments.
Discrepancy
and Nonconformance compliance of Civil foundation, building,
Mechanical Welding, Piping, Steel Structural, Equipment,
Electrical Instrumentation and Communication problem as per
project specific
Product Manager/Project Manager/Manager/Supervisor/Team Leader at GRIDCO , Bhubaneshwar, INDIA
September 1995 – May 2005
a)Construction and monitoring of E.H.T construction
works
b)Earth Mat design of 400/220/132 KV Electrical
substation. 9 nos of Earth mat design of 132/33 KV S/S and one no
of 220/132KV S/S completed. Associated with earth mat design of 1
no of 400/220 KV S/S
c)PTCC clearance of 400/220/132 KV line.
PTCC clearance of 20 nos of 400/220/132 KV transmission line were
processed.
d) Calculation of Induced Voltage between power and
telecom line. Induced voltage calculation were made for 10 nos of
cases
e) Procurement of Transformer and preparation of technical
specification and tender document
f) Design of Transmission line
and Sub Station
g) Operation and Maintenance of 132/33/11KVE.H.T
Substation &132/33KV Switching Substation
h) Energy Audit and
conservation
i) Maintenance of system stability analyzing load
flow studies
j) Safety and protection of Electrical Equipment
and personnel
k) SCADA : General Arrangement, Software
WTV32
l) Power Analysis Software: NAP, Generation software: GAP
, Rural Electrification Software: ELVIRA,Voltage drop software:
LV PLAN, Layout Software: SMARTDRAWElectrical Design Software:;
EDR, Power System Analysis:IPSAR
DETAILED WORK
ANALYSIS:
Transmission lines
transmission line route selection
and review
conceptual design, design checking and approval
terrain evaluation
reparation of line profiles
selection of
conductor type and size
tower design
Line termination design
preparation of cost estimates
cost/benefit analysis
detailed design and specification.
Substations and switching
stations
conceptual design and design review
detailed design
and specification
construction management and supervision.
Insulation coordination
selection of basic impulse insulation
levels
coordination of protective devices with apparatus
insulation
selection of location of protective
devices.
Earthing
earth resistivity measurements
earth network
impedance calculations
transmission line structure earthing
designs.
Fault level calculations
preparation of fault
calculations
establishment of equipment rating requirements
development of protection schemes
Selection of protective
equipment.
Environmental impact studies
Construction
management
preparation of specifications and bid documents
tender evaluation and contract award recommendation
[
Compilation of tender documentation and consequent supplier
contract negotiations, based on internationally accepted
conditions of contract. Specification for HV and MV switchgear
equipment Specification for power transformers, reactors and
auxiliary transformers Specification for auxiliary equipment
Specification for civil works Substation layouts Evaluation of
the submitted tender documents. Site visits and reports Site
commissioning Control the design, development and modification
of electrical drawings and prepare technical documentation for
client review, construction and "as built]
construction
management and supervision
contract coordination
procurement of material and equipment
inspection and testing
of material and equipment
Product Manager/Project Manager/Manager/Supervisor/Team Leader at ENERGY , Bhubaneshwar, INDIA
November 1983 – September 1995
• Past Exp( Serve as A.E in Govt of Orissa from 23.11.83 to
15.9.95)
• Hydro Power/ Thermal/Tidal/ Wind/Atomic Project
Identification, Prefeasibility, Feasibility study, DPR,
Appraisal
a) Preparation of Project report of micro/ mini/
small/ medium Hydel projects. Design and socioeconomic survey of
10 nos of micro hydel project, 15 nos of mini hydel project, 2nos
of small hydel project were done. In addition to above
prefeasibility design and socioeconomic survey of 1 no of medium
hydel project completed. In addition to above I associated with
the preparation project report of 1 nos of major hydel
project.
b) Preparation of site selection committee report of
thermal, tidal, wind , nuclear power projects. Preliminary report
was made for 5 nos of Thermal, one no of tidal , one no of wind
and 1 no of Atomic Power project.
c) Survey and Investigation of
Two nos of small Hydel Project and one no of Mini hydel project
completed.
a) Environmental Impact Analysis of Major Hydel
Project. Environmental Impact Analysis of 2 nos of cases
completed.
b) Environmental Impact Analysis of Thermal Project.
E.I.A of 1 no case completed
c) Forest Clearance of 400 / 220 /
132 KV line. Forest Clearance was processed for 20 nos of
400/220/132 KV transmission lines
d) Environmental Audit
(e)Environmental Education (f)Environmental Awareness
(g) Land
acquisition of 400/ 220/132KV S/S
h) Environmental management
plan( E.M.P for 3 nos of cases were done)
i) HAZOP &HAZID
facilitation Software HAZOP MANAGER PRO
j) Fault Tree and Event
tree Analysis, Montecarlo Simulation Waste Water Modelling
software : GPS-X-4.1.2