Process Engineer
at
Ultra Tech Cement LTD
, Anantapur, INDIA
February 2008 – September 2009
Industry: Construction/Engineering/Cement/Metals
Functional area: Production / Maintenance / Quality
• Involved in Phase-II Commissioning Work a 10000 TPD Plant by
KHD Humboldt, Germany.
• Total plant is controlled through DCS
system from Central Control System.
• Successfully
Commissioned LOESCHE Vertical Roller Mills ( LM 43.4 Coal Mill ,
LM 69.6 Raw Mill and LM53.3+3 Cement Mill)
• Optimization of
new and old phases, where ever scope is possible
Process Engineer at The India Cement LTD , Guntur, INDIA
September 2005 – February 2008
Industry: Construction/Engineering/Cement/Metals
Functional area: Production / Maintenance / Quality
• Well versed in Heat balance of a kiln system, measurement of
airflow, temperature and pressure profile, false air monitoring
across the preheater and other system.
• Responsible for
breakdown analysis of problems and to troubleshoot
them.
• Work collaboratively with different departments and
personnel to optimize production
• Commissioned LNV Separator
to convert Open Circuit ball mill to Close circuit
Process Engineer at J K Cement Ltd , Nimbhahera, INDIA
January 2003 – August 2005
Industry: Construction/Engineering/Cement/Metals
Functional area: Production / Maintenance / Quality
• Accountable for running of plant machinery in consistency
with the ISO 9000 quality standards.
• Ensure safety of plant
and personnel from raw material grinding, kilns, coal mills and
finished products grinding to EOT crane operation.
• Keep
abreast of existing and evolving technologies and industry
standards.
• Well versed in operation of Mills (Ball mills and
vertical roller mill)
• Well versed in Heat balance of a kiln
system, measurement of airflow, temperature and pressure profile,