Electrical Engnr-Other
at
Rajsathan Rajya Vidyut Prasaran Nigam Ld
, Bikaner, INDIA
October 1997 – August 2010
Industry: Oil and Gas/Power/Infrastructure/Energy
Functional area: Site Engineering / Project Management
I. Construction Experience of constructing 132 KV. Grid sub-
station /220 KV GSS/along with the comprehensive erection
experience of various equipments like Power
Transformer,Ckt.Breakers,CT’s,PT’s,LA,CVT’s,Isolators of
with and without Earthing,Tendom Isolators,Ctrll.Panels with
ctrll wiring, Vast Experience of Erection of various
structures,like
P,Q,R,X,Y,Z,GFBeams,GDBeams,AB1,BB1,AT1,AT3,AT4,AT6,AT7,AT8,AO1,B
O1,BT1,BT3,BT4,BT6,AO5,CT Structures etc
II. Construction
Experience of constructing New 132 KV/ 220 KV / 400 KV Single
Ckt. / Double Ckt. transmission lines along with full
Civil/Electrical works.
III. Experience of doing spillover works
of existing grid substations, like creating new 132 KV, 33 KV, 11
KV Bays as per the requirement of DISCOMS etc.
B. Details of
Maintenance Experience (1997-1999)
I. Ckt. Breakers
–VCB,GCB,OCB
II. CT’s/PT’s
III. CVT’s
IV. LA’s
V. I
solators with and without EB’s
VI. Tandem
Isolators
VII. Power Transformers,
VIII. Experience of
attending crash Maintenance, Sudden Maintenance like attending
Red Hot Spots etc
IX. Experience of Changing Damaged
Conductor/Earth wire.
X. Besides this I have got experience in
Maintenance Planning & Scheduling
preparing commissioning
schedules in coordination with equipment supplier, erection
engineers, testing (Protection) and commissioning team to match
with the project completion plan.
Streamlining the maintenance
and upkeep of all the plant/Grid equipments by implementing
predictive and preventive maintenance procedures.
Supervising
the site construction work including commissioning testing of
various systems/equipments.
Planning effecting preventive
maintenance schedules of plant/grid equipments to increase
reliability and redundancy.
Proactively identifying areas of
obstruction/breakdowns and taking steps to rectify the plant /
grid equipments through application of troubleshooting tools.
Executing cost saving and energy saving techniques/measures and
modifications to achieve substantial reduction in O&M
expenditures and work within the planned budget.
Implementing
various techniques for cycle time reduction, entailing
identification of opportunities, energy audits, analysis of data,
cost benefit analysis, implementation & post audits.