QA/ QC Exec.
at
Mil Industries ltd
, Chennai, INDIA
May 2003 – May 2007
Industry: Oil and Gas/Power/Infrastructure/Energy
Functional area: Production / Maintenance / Quality
v Contacting stage wise inspection during fabrication and
erection.
v To prepare stage and final inspection report
v To
verify in coming raw marital specification and customer
documents
v Co ordination with the NDT/ PWHT crew.
v Prepare
RFI request and summit client
v NDT/PWHT/HT Report
Preparation
v Offering and coordinating the client
inspection.
v Conducting procedures and welder qualification
test
v Inspection of fit up, welding consumables as per the
client requirements
QA/ QC Exec. at Gama com WLL , Alkhor, Qatar
June 2007 – May 2008
Industry: Oil and Gas/Power/Infrastructure/Energy
Functional area: Production / Maintenance / Quality
Inspection of fit up, welding and consumables as per the
client requirements
Spool released documents preparation and
offering client inspection
Witnessed hydro test, pneumatic
test, reinforcement pad leak test , leak test,
Co
ordination with the NDT/ PWHT crew.
Offering and coordinating
the client inspection.
Conducting procedures and welder
qualification test
Inspection of material necessary for
installation as per standards
To supervise daily inspection
of fabrication wo
QA/ QC Exec. at Saudi international petrochemical compan , Jubail, Saudi Arabia
June 2008 – December 2009
Industry: Oil and Gas/Power/Infrastructure/Energy
Functional area: Production / Maintenance / Quality
v Inspection and erection of piping system as per approved
isometric & PID drawing
v Inspection of Punch listing of piping
prior to MC, RFC&RFSU
v PMI Checking in all Project raw material
and all related documents
v Witnessed hydro test, pneumatic
test, reinforcement pad leak test, flushing /air
blowing
v Checked valve orientation on high pressure steam and
other critical lines before erection / fit up
v Verification of
field rectification report issued by construction
QA/ QC Exec. at Saipem SpA , Abudhabi, UAE
August 2012 – May 2013
Industry: Oil and Gas/Power/Infrastructure/Energy
Functional area: Production / Maintenance / Quality
v Material receiving and Erection inspection of static and
rotating equipment
v Static and rotating equipment alignment and
elevation and centering inspection
v Column internal trays
inspection
v Preservation of static and rotating equipment as
per vendor requirements
v Verification and subcontractor
mechanical completion certificate.
v Issuance of non-conformance
reports (NCR) and action for timely closing
v Coordination to
third party inspector
v Co ordinate weakly QA/QC meeting to PMC