|
|
|
Overview |
The Project is just behind TCS Karapakkam Building, in the manimegalai nagar layout. The layout is an upcoming development in the Karapakkam region with the marg mall coming 100 meters from the property. The Layout is 200 meters from the main road. Karapakkam is an upcoming locality with IT Parks, Mall and Residential pockets
|
|
About Us |
Company |
Handsel Constructions was Started in 2004. We have jointly developed properties with KG Builders and Indus Group and have delivered 500,000 Sq.Ft of IT Spaces. From 2008 we have ventured into Duplex Houses and residential flats. |
|
Vision |
Build a sustainable organization that produces spaces being defined. |
|
Mission |
To become One of the Top 5 Builder in the southern region by 2020 building sustainable environments and ecological homes.
|
|
|
|
|
Specification |
• Vitrified Tile Flooring 2’x2’ Marbonite or Equivalent.
• Glazed Ceramic Tiles 7’ Ht. For Toilet Walls- Kajaria of Johnson.
• Anti Skid Ceramic Tile Flooring in Toilets.
• Granite Cooking Platform with SS Sink.
• Coloured Sanitaryware of Hindware or Parryware.
• Jaguar Plumbing Fixtures.
• Teak Wood Joinery with Designer Shutters.
• Glazed Windows in either TeakWood or UPVC.
• 3 Phase Power Supply with MCB, Db.
• Modular Switches- Roma or Equivalent.
• Car Parking.
• Land Scape.
• Rain Water Harvesting. |
|
|
|
|
|
|
|
|