Working Life Management:
Testing and commissioning of VCB, PCVB, ACB, and MOCB & ISOLATORS.
Working knowledge & maintenance of 132 KV /11KV sub station with 40MVA,11KV/132KV generating transformer, and 11 KV /415V distribution transformer with SF6 C.B. and its control circuit and protective equipment’s.
11KV Turbo-Gen
Done Differently:
Specially Erection &Commissioning job attend from2001 in part time with :
M/S R. K. ENGINEERING SERVICES (Consulting & Service Eng.)NAGPUR
M/S SYD. KAMAL ASSOCIATES (A. Class Contactor) Raipur.
Growth Strategy:
To become a successful technical in the Power Industry by continuously working in a Challenging Environment with Opportunities to develop myself while excelling at everything I do.
Role Model:
DEEE The State University Ryp Campus. Bilaspur 2nd
2006
I.T.I. C.G. Multi-purpose Polytechnic Mahasamund.. Mahasamund 2nd 2002
MCVC Shahid Mishra Vocational College Tirora (M.H.) Nagpur 2nd 1993
Contribution to the field
I would like to introduce myself as an Shift In charge (Electrical) presently working with Shri Bajrang Metallics & Power Ltd, Raipur for 16 MW CPP.